Building in a tropical climate:
10 questions to ask before you start.

You have a plot, a house or a facility to build in the tropics, and you may well live in Europe. This guide helps you ask the right questions before you commit the first euro.

It is for individuals building “back home”, investors and developers, NGOs and institutions. It does not replace a study of your site: it helps you prepare for one.

Each question is followed by what to check, and by an example from swd architecture’s projects where relevant.

Talk about my project

Questions 1 to 5: the project, the site, the climate, the rules, the budget

01

What is your project, really?

A good project starts with a clear brief: who will live, work or be welcomed in this place, and how.

  • List the uses (living, renting out, providing care, looking after children, hosting tourists) and their order of priority.
  • Note the number of people, the rooms needed and the floor areas you want.
  • Think ahead: extending later, renting out part of it, changing its use.

SWD example

For the 1,2,3 Soleil nursery in Saint-Joseph (Réunion Island), the brief set out from the start a large terrace as the children’s main living space.

See the project →
02

What does your site tell you?

The site determines much of the project, and its cost.

  • Access: the road, and access for lorries and materials during the works.
  • Slope, soil type, rainwater run-off, known risks (flooding, landslides).
  • Available utilities: water, electricity, sewerage.
  • Neighbours, views, existing vegetation to keep.

A site survey and, depending on the project, a soil study are often the first useful expense.

03

How can you make the climate work for you?

In a tropical climate, comfort comes from design first, before air conditioning. Reference guidelines, such as the PERENE framework developed in Réunion Island, stress three points:

  • Protect from the sun: a high-performance roof, roof overhangs, protection for windows and exposed walls.
  • Let the air through: natural cross-ventilation, meaning rooms open onto two opposite façades.
  • Use vegetation: gardens and trees around the building cool its surroundings.

These principles are adjusted to your site: altitude, prevailing winds, exposure. They are decided early, because they set the orientation and shape of the building.

SWD example

At the Anne Badi Djeon Medical Centre (Côte d’Ivoire), a central patio brings shade and vegetation, and air circulates freely. Compressed earth block (CEB) walls act as a climate regulator, and an earth dome lets in natural light.

See the project →
04

Which rules apply to your project?

Every country, and often every municipality, has its own planning rules and permits. Don’t rely on hearsay.

  • Ask the municipal planning department or the relevant authority.
  • Find out which permits are required (building permit or equivalent) and how long they take.
  • Check the title deed and the plot boundaries before any investment.
  • Find out the conditions under which architects may practise in the country of the project.
05

What is your real budget?

The cost of the works is only part of the total budget. Also allow for:

  • studies: survey, soil study, technical studies;
  • architect’s and engineers’ fees;
  • taxes and permit fees;
  • utility connections;
  • a contingency margin.

Set a maximum budget before drawing: it should guide the choices, not the other way round.

Questions 6 to 10: materials, partners, follow-up, schedule, security

06

Which materials are available locally?

Building with what is available locally often reduces transport costs and lead times.

  • Identify local supply chains: earth, timber, stone, blocks made on site.
  • Raw earth, especially as compressed earth blocks (CEB), is made locally from the soil of the site or region. Professional rules exist, for example for CEB in Mayotte.
  • Check that there are local craftspeople trained in these techniques.

SWD example

The Anne Badi Djeon Medical Centre (Côte d’Ivoire) is designed with earth as its building material.

See the project →
07

Who will your partners on site be?

A remote project relies on a trusted local team.

  • A local engineering firm or architect, depending on the country’s rules.
  • Building contractors with verifiable references.
  • A trusted person for site visits and paperwork.

SWD example

In Réunion Island, swd architecture works with a local partner builder for houses and villas.

08

How can you follow the project from a distance?

Living in Europe does not stop you following your project, provided it is organised from the start.

  • Set a regular rhythm of video meetings and written reports.
  • Ask for dated photos at every key stage of the works.
  • Plan site visits at decisive moments.
  • Keep drawings, quotes and decisions in one shared space.
09

What is a realistic schedule?

The schedule also depends on factors beyond your control.

  • Rainy seasons can slow down some works.
  • Permit processing times vary between countries and municipalities.
  • Supplying some materials or equipment can take time.

Plan backwards from your target date, with margins.

10

How can you secure your investment?

Unpleasant surprises often come from commitments made too early.

  • Move forward in stages: feasibility, design, permits, contractor tendering, works.
  • Link each payment to a completed and checked stage.
  • Sign written contracts that describe the services, timescales and prices.
  • Start with a feasibility study: it confirms the project stands up before the big spending begins.

What next?

If you have answered these ten questions, you are already one step ahead. The next step is to test them against your site.

That is the purpose of swd architecture’s feasibility study: the site, the rules, your brief, one or more scenarios as outline plans, and a budget envelope. It can be carried out remotely, in France, West Africa or the Indian Ocean.

The fee is set after a free 30-minute first conversation. If you entrust us with the rest of the project, it is deducted from our fees.

swd architecture — Building together for a better life, from Europe to the tropics.

Sources

  • Natural cross-ventilation and the PERENE framework (Réunion Island): Envirobat Réunion presentation, 2009
  • PERENE and the role of vegetation: JACO guide, LEU Réunion
  • Principles of tropical building (narrow building, cross-ventilation, sun protection): TEC-Tec guide, University of Réunion / LEU Réunion, 2020
  • Natural ventilation, lessons learned: Agence Qualité Construction, 2022
  • Compressed earth blocks, Mayotte professional rules and standard XP P13-901: FFB, BTC Mayotte
  • Earth construction: CRAterre, International Centre for Earth Construction